Infra Update – July 2017

0 1

Download (PPTX, 3.92MB)

Completed:

  1. Footpath & Drain work– West Lane 12 (Arvind Mills Road)
  2. Construction of RCC Road at Pump house.
  3. Construction of 7KLD STP ESBR Technology at ELCITA office.
  4. Providing MS Railing for pedestrian safety near NTTF – West Avenue 1 (Infosys Avenue)
  5. 20 e-toilets Installed at various location of Electronics City and Operational– Completed.  (West & East Phase)
  6. Shiting & Refixing the Kerstone, Removing of Pavers for Road Widening. (West Avenue 6).
  7. Pot Hole Filling all over Electronic City.
  8. Speed Humps & Traffic Arrow Marking (West Phase).
  9. Kerbstone Painting along West Avenue 4 & 8.
  10. Shifting of Pole, Erecting of Spun Pole, Relocation of Transformer, RMU & Raising of Transformer by installing new Spun Pole for Junction Improvements along West Avenue 8 (Pump house road), Electronics City West Phase, Bangalore – 560100.

Work In Progress:

  1. Asphalting – Pump house Road (West Avenue 8).
  2. Footpath Work from BHEL to 3 M Junction.
  3. Supply, Installation & Commissioning of Compact RMU 2nos With DAS specification & providing UG cable replacing all the BESCOM poles from Tata power to Devon Innovation, West Avenue 8, Electronics City West Phase, Bangalore – 560 100.
  4. Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc., (West Avenue 2)
  5. Providing Chamber of size 500mm x 500mm x 1000mm deep for camera located at street light pole (West Avenue 2)
  6. Proposed construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs from Xime Junction to Tata power rear gate &  TCS Gate no 2 to Edizi Tools junction (East Avenue 2 & 4), East Phase
  7. RCC drain & Footpath work from Paramount to Wipro Gate no 5
  8. Construction of Retaining Wall & Laying of Pavers along HP Avenue (West Avenue 5).
  9. Shiting & Refixing the Kerstone, Removing of Pavers for Road Widening along Velankani Avenue (West Avenue 2).
  10. Ms Railing for Pedestrian near NTTF (West Phase).

Contract Awarded:

  1. Providing and laying of Asphalting using 60/70 grade bitumen

from Edizi Tools to TCS gate no 3 via Y-Junction, (East Avenue 1& 4). East Phase

Tender Published:

  1. Replacing Existing 6 Way old type MEI make conventional type RMU by 6 Way Compact type Schneider RMU DAS specification for F-5 Feeder Eminating from Keonics Muss near M/s BHEL Ltd, Electronics City West Phase, Bangalore – 560100.
  2. Providing and Laying Asphalting 60 70 grade bitumen from 3m Junction to Petrol Bunk Junction, West Lane 6 and West Avenue 9, Electronics City West Phase, Bangalore 560 100.
  3. Providing & Laying Asphalting 60 70 grade bitumen along West Lane 7, 8,9 and 10, West Avenue 11 Electronics City West Phase, Bangalore 560 100.
  4. Providing & Laying Asphalting 60 70 grade bitumen from Konar to KPTCL, West Avenue 3 and 5 Electronics City West Phase, Bangalore 560 100.
  5. Providing & Laying Asphalting 60 70 grade bitumen along East Avenue 5 Electronics City West Phase, Bangalore 560 100.

Contracts on Anvil

  1. Providing House Keeping Services to ELCITA within e-city Industrial Township Area.
  2. Providing Services for Solid Waste Management  to ELCITA within e-city Industrial Township Area.
  3. Shifting of Pole, Erecting of Spun Pole, Relocation of Transformer & Raising of Transformer by installing new Spun Pole for Junction Improvements at 3m & BHEL Side, Electronics City West Phase, Bangalore – 560100.
  4. Construction of 400 KLD STP in KSSIDC Land, West Phase.
  5. Construction of 500 KLD STP in KIADB Land, East Phase.