Completed:
- Footpath & Drain Works along West Avenue-9 (Petrol Bunk Road)
- 20 e-toilets Installed at various location of Electronics City and Operational– Completed. (West & East Phase)
- Construction of 3KL Capacity UG Sump for E- Toilet
- Opp DMart
- Tech Mahindra (East Phase)
- HP AVenue
- BWSSB
- Below Flyover (East Phase)
- Edizi Tools (East Phase)
- We School
- Pump house
- Providing MS Railing for pedestrian safety – West Avenue 1 (Infosys Avenue)
- Construction of Compound Wall– Pump House
- Providing Chequer Sheet Cover for STP Equalization tank to Avoid Smell going to the nearby companies
- Modification of Existing street light pole with LED lights, Splitters, Camera, Advertisement Board, etc completed
- West Avenue 1 (Infosys Avenue)
- West Avenue 8 (Pump House Road)
- West Avenue 9 – Petrol Bunk Road
- West Avenue 7 – Wipro Neeladri Road
- Footpath Work along East Avenue 1 (TCS Road)
- Footpath Work along East Avenue 1 (Hical Road)
- Construction of RCC Culvert 5th Cross junction – West Avenue 8
In progress:
- Proposed Skywalk from Ecity West phase to East Phase.
- Proposed construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs from Xime Junction to Tata power rear gate & TCS Gate no 2 to Edizi Tools junction (East Avenue 2 & 4), East Phase
- RCC drain & Footpath work from Paramount to Wipro Gate no 5
- Footpath work along HP Avenue.
- Footpath & Drain Works along West Avenue-8 (Police Station Side)
- Drain work– West Lane 12 (Arvind Mills Road)
- Construction of 7KLD STP ESBR Technology at ELCITA office
- Construction of RCC drain (XIME)– East Avenue 2
- Construction of RCC Drain Footpath works near Siemens – West Avenue 1
Contract Awarded
- Supply, Installation & Commissioning of Compact RMU 2nos With DAS specification & providing UG cable replacing all the BESCOM poles from Tata power to Devon Innovation, West Avenue 8, Electronics City West Phase, Bangalore – 560 100.
- Providing and laying of Asphalting using 60/70 grade bitumen
- from Edizi Tools to TCS gate no 3 via Y-Junction, (East Avenue 1& 4). East Phase
- Along Café Corner & JP IT Park Road
Contract Published:
- Shifting of Pole, Erecting of Spun Pole, Relocation of Transformer, RMU & Raising of Transformer by installing new Spun Pole for Junction Improvements along West Avenue 8 (Pump house road), Electronics City West Phase, Bangalore – 560100.
- Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc
- Providing House Keeping Services to ELCITA within e-city Industrial Township Area.
- Replacing the Existing RMU with New Compact RMU near M/s BHEL Ltd.
Contracts on Anvil
- Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs
- Erkadi System to Arvind Mills (West Phase)
- Construction of 400 KLD STP in KSSIDC Land, West Phase.
- Construction of 500 KLD STP in KIADB Land, East Phase.