Completed:
- Providing and laying of Asphalting using 60/70 grade bitumen along
- West Avenue-7 (Wipro Neeladri Road) (West Phase).
- West Lane-3 (JP IT Park Road) (West Phase).
- 300 KLD STP (West Phase)
- Construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs along
- West Lane-1 (near Goa Estate) (West Phase)
- West Avenue-9 (near Celstream) (West Phase)
- KSSIDC Complex (West Phase)
- Construction of RCC Drain along West Lane-6 (Ramsoft Road). (West Phase)
- Construction of RCC Culvert in front of MSME.(West Lane-1) (West Phase)
- Construction of RCC Culvert over storm water drain to continue the footpath near pump house (West Avenue-8). (West Phase)
- Construction of 6KL Capacity UG water sump for STP Treated water storage at KIADB. (East Phase)
- Providing & Fixing kerbstone for 300 KLD STP Road (West Phase)
- Removing & raising the Existing stone Kerbstone at KSSIDC Complex. (West Phase)
- RS Junction Improvement works. (West Phase)
- Construction of Footpath along
- In front of Petrol bunk existing Gate West Lane-1 (West Phase)
- KSSIDC Complex (West Phase)
- Construction of 20 feet deep well Rainwater Harvesting Pit 48 Nos at Various locations – Completed. (West & East Phase)
- 16 e-toilets Installed at various location of Electronics City and Operational– Completed. (West & East Phase) & 2 More E- Toilet Installation Work in Progress
In progress:
- Providing and laying of Asphalting using 60/70 grade bitumen inside KSSIDC Complex internal Road. (West Phase).
- Construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs along East Avenue-1 (TCS Road) (East Phase)
- Construction of SSM Drain along West Avenue-5 (near Ramakrishna Hospital). (West Phase)
- Construction of 80 KL Capacity Septic Tank (KSSIDC) & Sewer line work, West Avenue-10 (Canara bank road). (West Phase)
- Kerbstone Painting work along West Avenue-7 (Wipro Neeladri Road). (West Phase)
- Construction of Compound wall of 1m height above the existing Wall at KIADB land. (East Phase)
- Laying Kerbstone for 300KLD STP Road. (West Phase)
- Property Inventory, Asset Management and Development of Web-based GIS Application Software for e-Governance and Management of Electronic City Industrial Township Authority (ELCITA), Bangalore. (West & East Phase)
Contracts Awarded:
- Providing and laying of Asphalting using 60/70 grade bitumen along
- Café Corner & JP IT Park Road
- KSSIDC Complex Internal Roads
Tender Published:
- Providing Security Services to ELCITA within Ecity Industrial Area.
- Providing and laying of Asphalting using 60/70 grade bitumen from Tech Mahindra to Malgudi MUSS via Tata BP Solar, Shanthipura, Edizi & Tescom, Electronics City East Phase.
- Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs along Petrol Bunk Road & Golden Tulip Road.
Contracts Anvil:
- Providing House Keeping Services to ELCITA within Ecity Industrial Area.
- Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs along XIME Road, Electronics City East Phase.
- Landscaping work below fly over & the median located in West & East Phase.
- Construction of 500 KLD STP in KIADB Land, Electronics City East Phase.